This week our team made modifications on the plate mold so that we would be able to create a better fit between our components.
We also continued to start making the colored pieces that we wanted to manufacture 50 pieces of.
This led to work in the shop during our lab time, in order to continue towards our final product.
Following Thanksgiving we plan to get back into the shop as much as possible, in order to continue our work manufacturing.
Below is an image of Madee and Harith working on adjusting the plate mold.
Below, Thomas is working to get the ejector pins to fit to begin injection molding.